Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

New Windsor Salt – CSL vessel on its way to Halifax

MONTREAL – M/V Nukumi, Canada Steamship Lines‘ (CSL) new purpose-designed self-unloading ship built to service Windsor Salt, departed on her maiden voyage earlier today. The cutting-edge vessel with a deadweight of 26,000 metric tonnes will be the first diesel-electric Laker and the first single point loader to operate in Canada.

Leveraging their shared values of safety, sustainability and innovation, Windsor Salt and CSL began construction of the custom-made vessel in August 2020 after several years of collaborative planning, which included an environmental impact analysis, ship and shore personnel safety reviews, an efficiency evaluation of cargo operations, and navigational optimization.

The distinctive, purpose-designed vessel was created to service Windsor Salt’s need to deliver deicing salt from its Mines Seleine salt mine on the Magdalen Islands to stockpiles in Montreal, Quebec City, and other destinations within the provinces of Quebec and Newfoundland. Windsor Salt’s consistent and timely delivery of deicing salt helps keep roadways safe during the winter season across Eastern Canada.

The new vessel will bring a long-term, safe, sustainable and reliable shipping solution to the region that relies on the Mines Seleine salt mine. 

The new ship also features several innovations to enhance efficiency and safety including: 

  • A fixed, single point of loading system with a single hopper into which the salt is loaded, combined with a cargo handling system that eliminates the need for the vessel to shift during loading, which will improve the efficiency of cargo operations and the safety of ship and shore personnel.
  • A modern hull design and state-of-the-art propulsion system to enhance the maneuverability of the vessel and increase the safety of navigation in the shallow Magdalen Island channel.
Sailing from Jiangyin, China to Halifax, Canada, M/V Nukumi‘s voyage is expected to take six weeks. For more information visit mvnukumi.com.  

 

Facebook
Twitter
LinkedIn
Pinterest
Email